03/11/2014 Four-paddle is changed to two-fold, three-fold and four-fold coincidence using PMT (3&4,2&3&4, 1&2&3&4) respectively. DAQ started from 03/11/2014 15:00. 07/29/2014 An abnormal spike was observed at 07/28/2014 15:00, which was caused by the equipment test of other experiment happened in the same room as four-paddle. This spike was corrected by replacing it with average counts from 15:00 to 16:00 without the minutes when spike happened. 09/15/2014 Abnormal scaler values were found from two fold coincidence channel. 1667638 09/11/2014 09:52:37 628229 09/12/2014 11:03:17 1667638 09/11/2014 09:52:37 The above three values were replaced with average values of a hour before and after them. 10/09/2014 Four-paddle detector is temperary down for being moved to a new location. 10/30/2014 Four-paddle detector was moved to a new location (25 Park Place, 26th floor). New round of data recording has started since 10/25/2014. 02/05/2015 Two lines of abnormal scaler values were found in Feb. 03, 2015 08:23 am - 08:24 am. Muon counts in these two minutes were replaced with average values of a hour before and after them. 06/11/2015 DAQ system was found stopped working on 05/11/2015. The program was restarted. Several hours data were missing due to this event. 06/19/2015 The logic unit of 2-fold was found not working. A new unit was used for 2-fold coincidence. A efficiency factor of 1.025 has been applied to the early data of 2-fold coincidence to match the measurement before and after 06/19/2015. 12/09/2015 The detector is temporarily stopped because of the renovation in the room where the detector locates. 03/09/2016 Online monitering of muon flux is back online after a series of DAQ system fix and updates, which include replacement of coincidence module and adjuseting threshold values of discriminator and voltages of power distribution box.